Are you interested in our pumps or do you need spare parts? Then get in touch with us. We look forward to receiving your enquiry and will get back to you as soon as possible.
ipp Pump Products GmbH
Feldmühlenweg 6-10
D-49593 Bersenbrück
Fon +49 5439 80921-0
Fax +49 5439 80921-20
E-Mail: info@pump-products.de
Get in touch with our experts. Our team will advise you on the specification of our products and provide quotations for pumps from ipp Pump Products.
Dipl.-Ing. (FH) Thomas Moldenhauer
Managing Director
Sandra Straub
Executive Assistant
+49 5439 80921-0
sstraub@pump-products.de
Dipl.-Ing. (FH)
Walerij Stein
Technical Management /
Construction /Quality Manager
B.Sc.
Matthias Pohlkamp
Applications expert/ Sales
Thomas Genschel
Applications expert/ Sales
B.Sc.
Michael Krone
Technical support & Sales
Christiane Schimpfky
Shipping & Distribution
Maik Becker
Purchase
M.Sc.
Christoph Kuhlmann
Development Engineer
State-certified Tech.
Daniel Kleine-Börger
Development & Construction
Christoph Holtkemper
Order processing
Markus Bünnagel
Order processing
Annalena Hahn
Commercial clerk
Lea Welp
Commercial clerk
CIP/SIP cleaning of the centrifugal pump ensures no residue thanks to the hygienic design and O-rings with no dead space. The mechanical seal is located in the pressure equalisation flow on the back of the impeller for maximum hygiene and temperature control.
We manufacture high-tech pumps for hygienic applications. Our customers include big names from the pharmaceutical, food and cosmetics industries. ipp sets the very highest standards in product quality. This makes us the leader in technology and innovation.
CIP/SIP procedure - a challenge! Geometric aspect: Free of residues. With an EHEDG test, document no. 2, it has been proven that the ipp rotary lobe pumps are suitable for the CIP procedure without residues. During the steaming procedure (SIP) the pump doesn't need to turn, however this is necessary for the possible discharge of the condensate. „Self-Draining-Features“ (SDF) support this process. The EHEDG-certificate also includes document no. 8 which is valid for general construction and design details.
There are the following CIP procedures:
CIP-cleaning of the pump
CIP-cleaning of the pump and the system (All – In – ONE; no separate CIP pump necessary)